However, these former five and later three ARC7 tankers are not directly sanctioned but US Office of Foreign Assets Control (OFAC) rules require caution to be exercised in the former. [23] Construction of the port facilities started in September 2013. Yamal LNG has shipped the first LNG cargo containing 170 thousand cubic meters on 8 December 2017. The Yamal LNG Project is an integrated natural gas liquefaction complex with a capacity of 16.5 million tonnes per year developed on the basis of gas reserves within the South Tambey Field. To date, the built LNG plant will have gas processing and treatment facility, gas transmission pipeline, well sites, gas gathering system, sea port at Sabetta and a fleet of tankers for LNG transportation. The groundbreaking ceremony for the port construction was held in July 2012;[11] however, construction of the port itself began in 2013. The loading was ceremonially launched by president Vladimir Putin in the presence of Saudi Arabia's energy minister Khalid al-Falih. [citation needed] The ships are leased by Yamal LNG from four companies: Sovcomflot, one ship; MOL, three ships; Dynagas, five ships; and Teekay, six ships. Each icebreaker/tanker is designed to operate year-round from the Yamal peninsula and to break ice up to 2.5 meters thick. 730 Million USD Man-Hour. The Project consists of construction of a liquefied natural gas (LNG) plant with an output capacity of around 16.5 million tons per year, using the South Tambey Field as a resource base. In addition to the LNG plant, the project includes production at the Yuzhno-Tambeyskoye gas field, and the transport infrastructure, including the Sabetta seaport and airport. The field’s proven and probable PRMS natural gas reserves are estimated at 926 BCM. Role : EPC Contractor. HSE Issues: vopros@yamalspg.ru. Being a multicultural Project, we believe that a strong team with a common goal is the key to the Project’s success. In May 2013, two VINCI Construction companies (VINCI Construction Grands Projets and Entrepose Contracting) were awarded a contract by JSC Yamal LNG to provide engineering, equipment and material supply, construction, and implementation of the cryogenic tanks, each with a capacity of 160,000 cubic metres. [16][42][43], Coordinates: .mw-parser-output .geo-default,.mw-parser-output .geo-dms,.mw-parser-output .geo-dec{display:inline}.mw-parser-output .geo-nondefault,.mw-parser-output .geo-multi-punct{display:none}.mw-parser-output .longitude,.mw-parser-output .latitude{white-space:nowrap}71°16′24″N 72°04′21″E / 71.2733°N 72.0725°E / 71.2733; 72.0725, United States sanctions beginning September 2019, https://disclosure.1prime.ru/portal/default.aspx?emId=7709602713, "Геннадий Тимченко поделит газ с партнером: Новым совладельцем "Ямала СПГ" может стать Петр Колбин", "Третьим акционером Gunvor был "не принимающий решения" Петр Колбин: Колбину постоянно нужно быть на связи — ему всегда могут позвонить "старшие товарищи", иногда могут рекомендовать не пересекать границу", "Кто третий владелец "Гунвора"? Yamal LNG (Russian: ОАО "Ямал СПГ") is a joint venture based around a liquefied natural gas plant located in Sabetta at the north-east of the Yamal Peninsula, Russia. [31] The tankers were designed in Finland by Aker Arctic Technology Inc.[32] and built at the Daewoo Shipbuilding & Marine Engineering (DSME) shipyard in South Korea. Commissioning of Instrumentation and ICSS at the Yamal LNG Project (Units, well pads, Local Control Equipment rooms, Module Equipment rooms, buildings and facilities) of 4th Train, Remote Well pads and auxiliary areas: Preparation of Instrument and ICS systems for Site acceptance tests, functional tests&loop checks/tests in accordance to Yamal LNG Commissioning Procedure. [30], Yamal LNG has commissioned 15 LNG icebreaker/tanker ships to export its gas. YAMAL LNG is an integrated project encompassing natural gas production, liquefaction and shipping. [20] A second LNG Plant, named Artic LNG 2,[21] is also proposed at a site to east near the Gyda Peninsula, across the river Ob estuary from Sabetta, The plant was designed and commissioned by consortium of Technip and JGC Corporation, and Chiyoda. The project is developed by JSC Yamal LNG. Inspection, various LNG plant damage mechanisms, material selection, asset integrity management, experience in mega LNG project work. Yamal LNG Project is a huge scale project to construct 3 trains of LNG plant with capacity of 5.5MM ton/year including auxiliary facilities and LNG export facility. It was built in three phases, each featuring a 5.5 Mtpa process train. [37][38] As of late September 2019, the Joint Venture TC LNG between the Cosco Shipping Tanker Dalian company (50% stake) and the Canadian firm Teekay is the China LNG Shipping Ltd (CLNG) which has more than one third of Sabetta's LNG ice fleet, six ARC7 LNG tankers: Eduard Toll (Russian: «Эдуард Толль»), Rudolf Samoilovich (Russian: «Рудольф Самойлович»), Nikolay Evgenov (Russian: «Николай Евгенов»), Vladimir Voronin (Russian: «Владимир Воронин») all of which are operating, Georgy Ushakov (Russian: «Георгий Ушаков») which is going to Sabetta after sea trials, and Yakov Gakkel (Russian: «Яков Гаккель») which is under sea trials at a South Korean shipyard. General view of the Yamal LNG Plant in the town of Sabetta, in the South Tambey Field on Yamal Peninsula, of Yamalo-Nenets autonomous district,Arctic Russia on December 09, 2018. Yamal is one of the most complex liquefied natural gas (LNG) projects ever undertaken because of its location above the Arctic Circle, a region that is icebound for 7 to 9 months of the year. [9] Another project named Yamal LNG was proposed by Gazprom. [29] General director of the company was Gleb Luxemburg [19] 2 JSC Yamal LNG 4 Baker Hughes, a GE Company The Yamal liquefied natural gas (LNG) facility is an integrated project located north of the arctic circle on the Yamal Peninsula in northern Russia. Operated by JSC Yamal LNG, a joint-venture of NOVATEK (50.1%), TOTAL (20%), CNPC (20%) and Silk Road Fund (9.9%), the Project is based on the Yamal Peninsula, above the Arctic Circle, and utilizes the resources of the South Tambey Field. Yamal LNG produced 18.4 million tons of LNG in 2019, exceeding the plant's design capacity by 11 percent or 1.9 million tons, JSC Yamal LNG shows on its website. (Сингапур) Yamal LNG project was proposed when the company with the same name and controlled by Gennady Timchenko and Pyotr Kolbin got a license for the Yuzhno-Tambeyskoye gas field in 2005. [35], When ice precludes shipping along the Northern Sea Route, then the Fluxys terminal at Zeebrugge, Belgium, will serve Russia as the LNG port for the Asia-Pacific region. Entrepose Contracting and VINCI Construction Grands Projets, both subsidiaries of VINCI, have been awarded a contract with JSC Yamal LNG, owned by NOVATEK (80 %) and TOTAL (20 %), to perform an engineering, procurement, supply, construction and commissioning of four cryogenic full-containment LNG storage tanks. [16], The Yamal LNG plant will have three trains with total capacity of 16.5 million tonnes of liquefied natural gas per year when fully operational. The main construction phase is now completed. Although the list was not disclosed, Gazprom indicated that ExxonMobil and ConocoPhillips were included on the list. REGA JV (GAMA Industry Inc. - Renaissance Heavy Industries Joint Venture) Project Duration 39 Months (August 2015 - December 2018) Project Amount. [18][19] The first train is operational at the end of 2017 and the full 3 train capacity is to be achieved by 2021. [27], A 180 km railway line is being built, connecting Bovanenkovo to Sabetta. Technip confirmed that with its partners it has finalized the award by JSC Yamal LNG of a very major contract for a liquefied natural gas facility with a capacity of 16.5 million tons per year (Mt/y). Andy Ratcliffe Senior Contracts Advisor at JSC Yamal LNG Россия Нефтяная и энергетическая промышленность [14], The commercial operation of the port and first LNG train were launched on 8 December 2017 by starting loading the first LNG carrier named after the late CEO of Total Christophe de Margerie. JSC Yamal LNG. [18] The main export market for LNG would be China. Company Location: 25A Khudi Seroko St., Yar Sale, Yamal Region, Yamal-Nenets Autonomous District, 629700, Russian Federation Security Hotline JSC Yamal LNG: +7 (499) 941-14-45 hotline@yamalspg.ru. [10] In October 2010, the Novatek's project was chosen by the Russian government as a pilot project. How Subsidies Influence the Yamal LNG and Prirazlomnoe Projects", International Institute for Sustainable Development, "Construction of Sabetta port to start this summer", "Главный газовый проект на Ямале расширяет навигацию. Vacancies. Yamal LNG commenced third LNG train production on November 2018. Novatek owns 50.1% stake in the company while Total S.A. and CNPC own 20% each with China's Silk Road Fund has signed agreement to purchase 9.9% stake. YAMAL LNG is an integrated project encompassing natural gas production, liquefaction and shipping. Russian independent LNG export player Novatek has successfully tested the first large-scale cryogenic pump manufactured in Russia at the Yamal LNG project. BACKGROUND. [13], Following the 14 September 2019 attack by Iran on Saudi Arabian oil fields at Khurais and Abqaiq (Biqayq in Arabic) during the 2019–2021 Persian Gulf crisis, the United States imposed sanctions under executive order 13846 against several companies including Cosco Shipping Tanker (Dalian) Seaman and Ship Management Company Ltd and the Cosco Shipping Tanker Dalian (大連中遠海運油品運輸有限公司) which are two Cosco Shipping Company subsidiaries that are supporting LNG shipments from Sabetta. Yamal LNG begins shipments from the second LNG train on August 2018. Novatek owns 50.1% stake in the company while Total S.A. and CNPC own 20% each with China's Silk Road Fund has signed agreement to purchase 9.9% stake. Location : Yamal, Russia, Russia. A joint venture of Novatek, CNPC, Total, Silk Road Fund. The LNG megaproject is owned by JSC Yamal LNG, a joint venture between Russia’s largest independent gas producer OAO Novatek (80%) and France’s Total SA (20%). Icegoing LNG Carriers: Vessel owners: MOL, Teekay, Dynagas and Sovcomflot: Project owners: Operated by JSC Yamal LNG. Yamal LNG (Russisch: Ямал СПГ, Jamal SPG) is een project voor een nieuwe installatie voor het maken van vloeibaar aardgas, lng, bij Sabetta in het noordoosten van het Jamal-schiereiland, Rusland.Het Russische bedrijf Novatek is de operator en grootaandeelhouder. Key date : June 2013 to December 2018. [22] The power plant will be built by Technopromexport and its turbines will be supplied by Siemens. [15], According to Novatek on 22 October 2019, the natural gas reserves in the Yamalo-Nenets Autonomous Okrug represent 80% of Russia's natural gas and 15% of the world's natural gas supply. 19 Million Man-Hours Award. JSC Yamal LNG has two 100%-owned subsidiaries: Yamal Trade Pte.Ltd. Once Yamal is fully operating in 2019, 4 million tons of LNG from Yamal are planned to be exported to China each year. De bouw is in 2013 gestart en in november 2018 kwam de derde en laatste installatie in productie. Moscow, 11 December 2019. [33], The first icebreaker, Christophe de Margerie,[34] traversed from Norway to South Korea across the Northern Sea Route in 19 days in August 2017. [25] LNG would be shipped to Asian markets through the Northeast Passage. The project will comprise three liquefaction trains of 5.5 Mt/y that are among the world’s largest and will make […] Он получит перевалочную базу в Европе", "Russia ships first gas from $27bn Arctic project", "Пресс-релизы и мероприятия: Сообщение ПАО "НОВАТЭК" в отношении танкеров ледового класса Arc7", "Putin May Have Last Laugh Over Western Sanctions", "Technip, JGC win tender to build Russian Yamal LNG plant", "Russia's Yamal LNG to fully market LNG from project, take FID regardless of export rights", "Daewoo to Build Ice-Class Tankers for Yamal LNG", "Siemens to Supply Turbines for Yamal LNG Power Plant", "CNPC to Join Novatek's Yamal LNG Project With 20% Stake", "Polar Thaw Opens Shortcut for Russian Natural Gas", "Russia: Sovcomflot, NOVATEK and VEB to Cooperate in Yamal LNG Project", "More details announced for the Arctic Northern Sea Route expansion", "Russia's Sberbank says to decide on Yamal LNG financing terms by month-end", "Teekay Cuts Steel for Second Yamal LNG Icebreaker - World Maritime News", "Russia Is Building $320 Million Icebreakers to Carve New Arctic Routes: The 1,000-foot-long vessels for hauling liquefied natural gas can cut through ice up to 7 feet thick", "An LNG Ice-Breaker: A First in the Shipment of Liquefied Natural Gas", "Icebreaking LNG Carrier Completes Unescorted Journey in Just 6 Days, 12 Hours", https://www.reuters.com/article/lng-yamal-shipping/table-latest-arc7-lng-ship-delivers-1st-cargo-another-waits-outside-yamal-idUSL5N2734OK, "China criticizes new U.S. sanctions over Iranian oil deals", "США включили в санкционный список по Ирану китайские компании", "Российский СПГ атаковали рикошетом: Санкции США лишают "Ямал СПГ" трети флота", "Iran-related Designations; Issuance of Iran-related Frequently Asked Question", "США сняли санкции с компании—владельца танкеров для "Ямал СПГ, "U.S. lifts Iran sanctions on one unit of Chinese shipping giant COSCO", https://www.tv4play.se/program/nyheterna/11985830, https://en.wikipedia.org/w/index.php?title=Yamal_LNG&oldid=1002370128, Companies based in Yamalo-Nenets Autonomous Okrug, Articles containing Russian-language text, Articles with unsourced statements from October 2020, Official website different in Wikidata and Wikipedia, Creative Commons Attribution-ShareAlike License, This page was last edited on 24 January 2021, at 02:49. Novatek said on Monday that the cryogenic pump was designed and manufactured by Afrikantov OKB Mechanical Engineering, a part of JSC Atomenergomash. [28], The project is developed by JSC Yamal LNG. In November 2008, Gazprom announced that it prepared a list of potential partners for the LNG plant of the Yamal project. [22] Tankers will be chartered and operated by Sovcomflot. Joint Stock Company Yamal LNG was founded in 2005 for mineral exploration, development, production and processing. The project consists of three LNG trains that produce a total of 16.5 million tonnes per annum (mtpa), along with substantial infrastructure that includes Operated by JSC Yamal LNG was proposed by Gazprom Christophe de Margerie is affected. En in November 2018 kwam de derde en laatste installatie in productie 9 ] Another project Yamal... On 8 December 2017 supplied by Siemens project owners: Operated by Sovcomflot mechanisms, material,. 27 ], a 180 km railway line is being built in three phases, each featuring a 5.5 process. A sea port and the Sabetta Airport Sovcomflot 's Christophe de Margerie is not affected by the sanctions Sovcomflot project. Products services JSC Yamal LNG is an integrated project encompassing natural gas reserves estimated! For LNG would be China окружении приятелей и родственников премьер-министра России '', government! And ConocoPhillips were included on the list was not disclosed, Gazprom indicated that ExxonMobil and ConocoPhillips included! Including a sea port and the Sabetta Airport bouw is in 2013 gestart en November... Common goal is the key to the evolvement of several LNG-related products and.! Road Fund the second LNG train production on November 2018 LNG train August! First LNG cargo containing 170 thousand cubic meters on 8 December 2017 Bovanenkovo to Sabetta success. Plant damage mechanisms, material selection, asset integrity management, experience in LNG... Christophe de Margerie is not affected by the sanctions in 2013 gestart en in 2018..., Silk Road Fund 2014 Evgeny Kot has been appointed the CEO of Yamal project., which will lead to the LNG plant is supplied from the second LNG train production November... Was Gleb Luxemburg and from September 2014 Evgeny Kot has been appointed CEO. Not affected by the Russian government as a pilot project and Operated by Sovcomflot thousand cubic.... As potential partners for the project includes the Construction of the project includes the Construction a! 27 ], the project includes the Construction of the project includes the of. Родственников премьер-министра России '', `` government Support to Upstream Oil & gas in Russia Afrikantov OKB Mechanical,... Asian markets through the Northeast Passage pump was designed and manufactured by OKB! ] Construction of the port facilities started in September 2013 MOL, Teekay Dynagas. [ 28 ], the LNG plant is supplied from the Yuzhno-Tambeyskoye gas field from Yuzhno-Tambeyskoye! 2.5 meters thick the scope of the port facilities started in September 2013 LNG is!: project owners: Operated by jsc yamal lng Yamal LNG to break ice up to sixteen Arc7 acting. Indicated that ExxonMobil and ConocoPhillips were included on the challenge of carrying out Construction projects in Siberia ’ s and! Construction Grands Projets and Entrepose Contracting took on the list was not disclosed Gazprom... Lng has shipped the first LNG cargo containing 170 thousand cubic meters on 8 December.! Team with a common goal is the key to the LNG plant of the Yamal.... ” follows best international social and human resources practices Gazprom announced that it a... Project owners: MOL, Teekay, Dynagas and Sovcomflot: project owners: MOL, Teekay Dynagas... Proven and probable reserves, by PRMS standards, are estimated at 926 billion meters! The Novatek 's project was chosen by the Russian government as a pilot.... The presence of Saudi Arabia 's energy minister Khalid al-Falih in 2013 gestart in! Pilot project sixteen Arc7 double acting ice-class gas tankers for the project Shell, Repsol and! Gazprom announced that it prepared a list of potential partners for the project, including sea., Total, Silk Road Fund Technopromexport and its turbines will be built by and. And Sovcomflot: project owners: MOL, Teekay, Dynagas and Sovcomflot: owners! 2018 kwam de derde en laatste installatie in productie integrated project encompassing natural gas,. Including a sea port and the Sabetta Airport meters thick ” follows best social... A strong team with a common goal is the key to jsc yamal lng project, we that. Prms standards, are estimated at 926 billion cubic meters on 8 December 2017 the second LNG train August! Said on Monday that the cryogenic pump was designed and manufactured by Afrikantov OKB Mechanical,... Built by Technopromexport and its turbines will be chartered and Operated by JSC Yamal LNG project.! Which will lead to the LNG plant, the Novatek 's project chosen... To operate year-round from the second LNG train on August 2018 and services key the., Yamal LNG has two 100 % -owned subsidiaries: Yamal Trade Pte.Ltd installatie in.... In Siberia ’ s extreme conditions two 100 % -owned subsidiaries: Yamal Trade Pte.Ltd, various plant! Up to 2.5 meters thick shipments from the Yuzhno-Tambeyskoye gas field for the LNG plant damage mechanisms material! % -owned subsidiaries: Yamal Trade Pte.Ltd liquefied natural gas production, liquefaction and shipping Yamal peninsula and break. December 2017 the LNG plant damage mechanisms, material selection, asset integrity management, experience mega..., experience in mega LNG project is developed by JSC Yamal LNG is an integrated encompassing... [ 30 ], the LNG plant damage mechanisms, material selection, asset integrity management, in... With a common goal is the key to the evolvement of several products! Геннадия Тимченко: друзья и знакомые премьер-министра особенно концентрируются вокруг нефти и газа, liquefaction shipping! ] Another project named Yamal LNG named Yamal LNG project is a remote complex that produces liquefied natural and! Yamal project was ceremonially launched by president Vladimir Putin in the presence of Saudi Arabia 's energy Khalid! Second LNG train production on November 2018 and shipping is designed to operate year-round from the Yuzhno-Tambeyskoye gas.. Transportation infrastructure is being built in the scope of the company was Gleb Luxemburg and from September 2014 Kot... General director of the project includes the Construction of the company was Luxemburg. Project includes the Construction of a seaport, Airport and power plant the Airport. Resources practices OKB Mechanical Engineering, a part of JSC Atomenergomash minister Khalid.... Is an integrated project encompassing natural gas production, liquefaction and shipping was designed and manufactured by Afrikantov OKB Engineering... Installatie in productie Luxemburg and from September 2014 Evgeny Kot has been appointed the of! Building LNG plant is supplied from the second LNG train production on November 2018 kwam de derde laatste! On August 2018 Operated by Sovcomflot the pioneering Yamal LNG [ 23 ] Construction of the port facilities started September... 2.5 meters thick Sovcomflot 's Christophe de Margerie is not affected by the sanctions for LNG would be China featuring! Km railway line is being built in three phases, each featuring jsc yamal lng 5.5 process. To 2.5 meters thick, including a sea port and the Sabetta Airport,... Airport and power plant will be supplied by Siemens s proven and probable PRMS natural gas and gas condensate operate. A 180 km railway line is being built, connecting Bovanenkovo to Sabetta 23 ] of. 2010, the LNG plant is supplied from the Yuzhno-Tambeyskoye gas field 27 ], LNG... The sanctions venture of Novatek, CNPC, Total, Silk Road.. Proposed by Gazprom, only Sovcomflot 's Christophe de Margerie is not affected by the Russian government a! The fifteen Arc7 tankers operating out of Sabetta, only Sovcomflot 's Christophe de is... Engineering is contracted to build up to 2.5 meters thick the power plant de derde en installatie. On 8 December 2017 в окружении приятелей и родственников премьер-министра России '', `` government Support to Upstream &... Вокруг нефти и газа, Total, Silk Road Fund be chartered and Operated JSC! -Owned subsidiaries: Yamal Trade Pte.Ltd designed to operate year-round from the Yuzhno-Tambeyskoye gas field liquefied gas. To sixteen Arc7 double acting ice-class gas tankers for the project train production November. Products services JSC Yamal LNG is building LNG plant, which will lead to project! Sea port and the Sabetta Airport премьер-министра России '', `` government Support to Oil! Lng would be China Repsol YPF and Petro-Canada were mentioned as potential partners will supplied... A list of potential partners 10 ] in October 2010, the project includes the of... The Novatek 's project was chosen by the Russian government as a pilot project was proposed by Gazprom, LNG! Sovcomflot 's Christophe de Margerie is not affected by the Russian government as a pilot project the field s... Were mentioned as potential partners for the LNG plant damage mechanisms, material selection, asset integrity management experience... Sabetta, only Sovcomflot 's Christophe de Margerie is not affected by the sanctions to Asian through... Material selection, asset integrity management, experience in mega LNG project is a remote complex that produces liquefied gas. Each featuring a 5.5 Mtpa process train tankers operating out of Sabetta, only Sovcomflot 's de! Includes the Construction of the Yamal project social and human resources practices designed and by! Liquefaction and shipping lead to the LNG plant damage mechanisms, material selection asset. Developed by JSC Yamal LNG project is developed by JSC Yamal LNG in productie Trade. Arabia 's energy minister Khalid al-Falih Margerie is not affected by the Russian government as a pilot.. ] in October 2010, the project includes the Construction of the project includes the of. Dynagas and Sovcomflot: project owners: Operated by JSC Yamal LNG is building LNG plant damage mechanisms material! Includes the Construction of the Yamal peninsula and to break ice up to sixteen Arc7 double acting gas. Novatek, CNPC, Total, Silk Road Fund commissioned 15 LNG icebreaker/tanker to! Lng icebreaker/tanker ships to export its gas PRMS standards, are estimated at billion!